Sector
Education
Location
Pinner, Harrow
The Project
RAM Building Consultancy was appointed by Gesher School to undertake a feasibility study (up to RIBA Stage 2) for the provision of a new modular building to accommodate additional classroom space.
The proposed development aimed to deliver two specialist classrooms designed for Key Stage 3 and 4 pupils with mild to moderate special educational needs (SEND), incorporating life skills and therapy support spaces alongside essential ancillary facilities.
The Challenges
The project presented a number of key challenges requiring careful planning and technical consideration:
- Minimising disruption to a live school environment during construction
- Maintaining existing foul drainage systems without compromise
- Identifying a compliant and practical location within a constrained site
- Ensuring continued emergency access via the secondary entrance
- Designing spaces suitable for non-ambulant pupils in line with SEND requirements
In addition, the surrounding context; including nearby residential properties and adjacent recreational land, required a sensitive and well-considered approach.
The Solution
RAM Building Consultancy undertook a comprehensive site appraisal, including a detailed inspection carried out in December 2024. Close collaboration with the school’s leadership team ensured that operational priorities and long-term plans were fully understood.
Key Services Delivered
-
Site inspection and data collection
-
Feasibility study and reporting
-
Options appraisal with viable building locations
-
Budget cost estimates and risk analysis (time, cost, quality)
-
CAD drawings and site layout plans
-
Specification guidance and procurement advice
Design Considerations
The proposed modular building was designed to:
- Accommodate 20 pupils (10 per classroom)
- Provide life skills and therapy-focused environments
- Include toilets, storage, and support facilities
- Align with BB104 requirements (7.5m² per pupil)
The design also incorporated:
- Level access with platform lift
- High-performance insulated structure
- Mechanical and electrical systems including HVAC, fire safety, and ICT
- External works including drainage, hardstanding, and landscaping
Options Appraisal
Two primary locations were identified in collaboration with the client:
- North-West Courtyard Location
- Near secondary access point
- Efficient in cost but with reduced pupil capacity
- Western Elevation (Play Area)
- Better spatial provision for full capacity
- Higher cost but fully meets the project brief
Alternative areas of the site were excluded due to future development plans for sports facilities.
Risk Management & Technical Due Diligence
To ensure project certainty and mitigate risks, RAM recommended:
- Ground investigation surveys
- Topographical surveys
- CCTV drainage surveys
- Full utilities/services mapping
These early-stage investigations were critical in informing design development, cost planning, and programme certainty.
Programme Strategy
To minimise disruption, the project was planned to:
- Be delivered during school holiday periods
- Be constructed in a single phase, ideally over the summer
- Maintain safe access and operations throughout
The Results
RAM Building Consultancy recommended Option 2 as the preferred solution, as it:
- Fully meets the spatial and functional requirements
- Provides appropriate accommodation for all 20 pupils
- Supports the school’s SEND teaching and therapy objectives
However, Option 1 remains a viable lower-cost alternative, subject to the school’s priorities regarding budget versus capacity.
Added Value
Through early-stage strategic input, RAM Building Consultancy enabled the client to:
- Make informed decisions based on cost, risk, and functionality
- Align the project with long-term development plans
- Reduce uncertainty through robust technical investigations
- Ensure compliance with statutory and SEND-specific design standards
Conclusion
This project demonstrates RAM Building Consultancy’s ability to deliver practical, sensitive, and technically robust feasibility solutions within complex live environments. By combining strategic insight with detailed technical analysis, RAM supported Gesher School in planning a facility that enhances both educational delivery and student wellbeing. RAM has been appointed as Contract Administrator and Principal Designer for the ongoing development of the modular classroom, so will continue to support this project through to completion.
Services used:
Feasibility Studies
Feasibility Studies
RAM conducted a detailed feasibility study to explore preferred location and layout for the proposed building.
Feasibility Studies
Specification Writing
Specification Writing
RAM produced specifications for the modular build, including internal and external works such as toilets, storage and support facilities, mechanical and electrical systems, drainage, hardstanding and landscaping.
Specification Writing
Your Education Consultant
We are the UK's leading Education Building Consultants, using our extensive knowledge to deliver a range of building consultancy services; from feasibility to project management, to the education sector.
Our team of proactive RICS qualified Chartered Building Surveyors are here to support your facility's needs, from funding options, design and specification, tendering, to general advice on getting the most out of your estate and looking at reducing your carbon footprint.
Find out how we support our education clients, download our 'Your Education Consultant' brochure below

Let's Work Together to Design the Perfect Space
If you’d like further information or to discuss our Feasibility Studies, Specification Writing, or other services, please get in touch and one of our team will be happy to help.