The Project

RAM Building Consultancy was appointed by the Aspire Academy Trust to address the deteriorating condition of the school’s heating system. The threat of a complete breakdown was imminent, and the school needed to replace three aging gas boilers and the associated pipework to ensure reliable heating.


The Challenges

The existing heating system had significantly deteriorated over the years, posing a real risk of failure. The challenge was to secure funding and replace the boilers before they reached the point of complete breakdown, while ensuring minimal disruption to the school’s operations.


The Solution

RAM conducted a free condition survey of the school’s heating system to gather the necessary evidence for a successful Condition Improvement Fund (CIF) bid. After securing over £250,000 in funding, RAM was appointed as Lead Designer, Principal Designer, and Contract Administrator for the project. We managed the programme of works, including all Health and Safety requirements, from start to finish. The works were tendered before the CIF bid submission, ensuring a smooth transition once funding was approved.


The Results

The project was completed on time and within budget, delivering a new, energy-efficient heating system for the school. The upgraded boilers have significantly reduced the academy’s utility costs, allowing those savings to be reinvested into other areas of the school. The client was highly satisfied with the outcome, both in terms of quality and financial savings.

Services used:

CDM Principal Designer

As the Principal Designer, RAM ensured that all Health and Safety risks were identified and managed throughout the project. We oversaw compliance with the Construction (Design and Management) Regulations 2015, safeguarding the health and safety of workers and school personnel. Our role ensured the safe execution of the boiler replacement works, minimizing risks and disruptions to the school environment.


CDM Principal Designer
Contract Administration

RAM’s Contract Administration service was vital in managing the project’s timeline, budget, and overall execution. By overseeing the tendering process, coordinating with contractors, and ensuring compliance with the agreed specifications, RAM delivered a seamless project. The efficient contract management led to the timely completion of the boiler replacement, within budget, and to the satisfaction of the client.


Contract Administration

Let's Work Together to Design the Perfect Space